Director ▶ PM HandoverEasyStagecraft Module 3 · the form filled in at week-6 of rehearsal · "creative vision" hands off to "logistics + delivery" · no further additions without scope change

What this is. Until week 6, the director's role is dominant: they cast, block, develop, refine. From week 6 forward, the PM's role becomes dominant: tech, schedule, contractor work, compliance, performance run. The handover marks the line where "let's add this idea" stops being a free move and starts being a scope change. The form is signed by both. After signing, any addition routes through the Scope Change line on this form, not the rehearsal floor.
"From this point, our deal is: I won't second-guess your vision; you won't second-guess my logistics. The cue book locks Friday week-3. The set design locks today. The cast list is the cast list. Anything that wasn't on this form Wednesday afternoon comes back through the scope-change process — or it doesn't happen."

1 · The director's vision — locked at handover

Concept (one paragraph)

Setting / period / world

The 5 emotional beats the audience MUST feel (in order)

Visual signature — design choices that define this production

ElementChoiceNon-negotiable? (Y/N)
Set look (1-sentence)
Lighting palette (cool / warm / contrast)
Costume palette
Use of haze / atmospheric
Use of projection / video
Music / soundscape (live band, recorded, mixed)
Featured set piece (revolve, raked, fly element)

Special effects requested (each = a separate compliance check)

EffectWhere in the showApproved / alternativeBy whom

2 · Cast / crew snapshot at handover

Cast complete + understudies confirmedY / N · notes:
Cast off-book Act 1Y / N:
Cast off-book Act 2Y / N (typical week 6 = part):
Crew SM appointed + contract signedY / N:
HODs (LX / SND / Set / Costume) appointedY / N:
Parent volunteer roster lockedY / N:

3 · Open questions (the director's "I'm still thinking about" list)

List anything not yet locked. PM treats each as either "answer by [date]" or "decide a default; director can override before lock-date".

Open itemDeadline to lockDefault if undecided

4 · Scope-change process from this date forward

  1. Director identifies a desired addition / change.
  2. Director fills in the Scope Change request below (paper or digital).
  3. PM responds within 48 hours with cost / schedule / safety impact + Y / N / alternative.
  4. Director accepts, rejects, or escalates to principal.
  5. If approved: PM updates the production approval pack + relevant SWMS · LX HOD updates the cue book if affected · everyone signs.
  6. If rejected: documented in writing; same change cannot be re-raised within 7 days.

Scope Change request — template

Change requested
Reason
Where in the show
Director's name + date
PM response (Y / N / alternative)
PM cost / schedule / safety note
Final decision + by whom

Sign-off

Director signature Date
Director — print name  
Production Manager signature Date
PM — print name  