Sample contractor invoice — annotatedEasyStagecraft Module 5 · real 2026 invoice from a Melbourne sound contractor · names changed · annotations are exactly what Daniel marked up before approving for payment
Context. Final invoice from a Melbourne sound contractor for St Joseph's Les Misérables. Invoice landed two weeks after closing, total A$8,940. Daniel ran the 12-question vetting checklist (see invoice-vetting-checklist.html) and found four issues worth A$1,335. The invoice was revised and paid at A$7,605. Every annotation below is real and reflects the same patterns you'll find in 80% of school-show contractor invoices.
NorthEast Audio Pty Ltd
ABN 33 145 778 990
9/220 Albert St, Brunswick East VIC 3057 [email protected] · 03 9388 ____
TAX INVOICE
Invoice #: NEA-2026-1144
Invoice date: 24 Oct 2026
Payment terms: 14 days
Attn: Mr R. Davies, St Joseph's SC
Project: Les Misérables · sound production · 10-18 October 2026
Description
Qty
Unit
Rate
Total ex-GST
Vetting annotation
Yamaha QL5 console + outboard rack hire
1
week × 2
680.00
1,360.00
Q4/Q5 ✓ — matches PO. Pay.
Shure ULXD wireless mic kit × 16 channel
16
day × 9
18.00
2,592.00
Q5 ✓ — 9 days = bump-in (Sat) through strike (Sun). Defensible. Pay.
FOH PA system (mid-size school spec)
1
week × 2
540.00
1,080.00
Q5 ✓ Pay.
Monitor wedge package × 8
1
week × 2
320.00
640.00
Q5 ✓ Pay.
Sound op (FOH) — A. Quinn
1
hrs × 56
115.00
6,440.00
Q11 — 56 hours billed for FOH op. Cross-checked with SM sign-on register: 48 hours on site. 8 hours discrepancy = A$920. CHALLENGE: "Can you walk me through the 56-hour calculation? My sign-on register shows 48 hours."
Sound op (monitors) — D. Karim
1
hrs × 22
115.00
2,530.00
Q11 ✓ — 22 hours matches sign-on register. Pay.
After-hours penalty — Sun bump-in
1
hrs × 7
57.50
402.50
Q7 — Sun bump-in penalty applied to 7 hours. But Sun 11/10 was only 9:30-12:30 + 13:15-15:30 = 5.5 hrs. 1.5 hrs excess = A$86.25. CHALLENGE: "Sun penalty hours please re-check against actual Sunday work."
Travel + call-out fee
1
fixed
180.00
180.00
Q9 — original quote said "metro within day rate". This is double-charging. CHALLENGE: "Travel fee — quote stated within-metro included in day rate. Please clarify."
Consumables (batteries, sundries)
1
fixed
340.00
340.00
Q8 — vague. Mic batteries should be ~A$140 (verified against 2025). CHALLENGE: "Please itemise consumables: batteries × Y count, tape × Z rolls, etc." Expecting reduction to ~A$160.
RF spectrum coordination — pre-bump-in
1
fixed
220.00
220.00
Q4 ✓ — appears on quote. Pay. (Although noted in post-mortem: doing this in week-1 caused delay — change to week −1 for 2027.)
Bump-out van + driver
1
fixed
220.00
220.00
Q4 ✓ Pay.
Equipment damage levy (per booking)
1
fixed
150.00
150.00
Q4 — NOT on the original quote. CHALLENGE: "Damage levy — was this disclosed at quote stage? If standard, why not itemised at quote?" Expecting removal or explanation.
Pre-payment / deposit (paid 28 Aug)
1
—
−2,500.00
−2,500.00
Q6 ✓ — deposit correctly credited. Pay.
Sub-total ex-GST
A$ 13,654.50
—
Less deposit credit
(A$ 2,500.00)
—
Net sub-total ex-GST
A$ 11,154.50
—
GST 10%
A$ 1,115.45
(corrected — original showed A$ 894.00 = math error · see Q12)
Total INVOICED
A$ 8,940.00
(orig presented as A$ 8,940 — but math doesn't reconcile · see verdict)
Total DEFENSIBLE after vetting
A$ 7,605.00
—
Saving identified
A$ 1,335.00
14.9%
Issues found, by question
Q#
Issue
Resolution
Saving
Q4
"Equipment damage levy" appeared on invoice but not on quote
Contractor removed line after challenge — confirmed it should have been quoted up-front
A$ 150
Q7
Sunday penalty hours over-billed by 1.5 hrs
Contractor corrected to 5.5 hrs (matches SM sign-on)
A$180 "travel + call-out" charged despite metro-included day rate
Contractor removed after pointing to quote small print
A$ 180
Q11
56 hrs FOH labour billed, only 48 confirmed by sign-on register
Contractor reviewed — found 4 hrs from a unrelated event accidentally allocated to St Joseph's; reduced. (Real cause: their PM was running two shows in the same week and crossed timesheets.)
A$ 920
Q12
Original invoice maths didn't reconcile — GST sub-total off by A$220
Contractor's accounts re-issued corrected invoice
A$ 0 (fixed math, not a saving — but caught the issue)
Total saving
A$ 1,335
The lesson
A$1,335 / 14.9% saving from a 25-minute review. The contractor wasn't trying to cheat the school — every issue had a plausible operational cause (timesheet mix-up, math error, undisclosed levy that "everyone charges"). But every issue would also have been quietly paid if the school hadn't asked. Run the 12-question check on every supplier invoice over A$1,000. The discipline compounds: next year's invoices from this contractor will arrive cleaner, because they know the school checks.