Capstone assessment rubric · 12 criteriaEasyStagecraft Tier 1A · Module 6 · how your portfolio is scored · the lens the assessor uses · the bar for each grade

Grading bands. Each of the 12 criteria is scored Critical-fail / Pass / Credit / Distinction. Overall portfolio = sum of criteria + qualitative weight. Bands: PASS (8+ pass, <2 critical-fails) · CREDIT (8+ pass, 4+ credit, 0 critical-fails) · DISTINCTION (8+ credit, 4+ distinction, 0 critical-fails). Critical-fail in any safety / compliance criterion (#1, #4, #7, #8) blocks pass regardless of other scores — that's deliberate.

Criteria

# Criterion Critical fail Pass Credit Distinction
1 SWMS quality No SWMS for any high-risk task OR SWMS missing the 7 standard sections 3 SWMS produced · all 7 sections present · scoring uses Module 1 matrix Pass + every hazard cites the specific AS/NZS standard or WHS reg Credit + residual score annotated with rationale + emergency rescue plan specific to this venue
2 Hazard register depth <8 hazards · OR no residual scoring 12+ hazards · uncontrolled + residual scored Pass + hierarchy-of-controls visibly applied (not just "PPE for everything") Credit + flying-harness sequence treated with named contractor, parent consent, principal sign-off, fallback plan
3 Scheduling realism No bump-in detail · OR schedule has no breaks · OR call-end-times unrealistic for a school context 12-week plan present · bump-in day-by-day · meals scheduled · 70% rule visible Pass + dependencies between departments explicit · contingency block named in writing Credit + labour-cost forecast aligned with the P&L · "what if LX is 90 min behind by lunch Sun?" scenario answered
4 Streaming / IP position No streaming-rights position stated · OR streaming arranged without rights confirmation Streaming-rights position explicit in writing (with or without) · grand rights receipted Pass + position rationale communicated to parents in the comms calendar Credit + AMCOS / sync rights addressed for any pre-recorded music
5 Budget defensibility P&L doesn't balance · OR exceeds principal cap without explanation · OR is missing major cost categories P&L sums to a positive net OR explicit explanation of deficit · 5 cost + 5 income categories Pass + ticket pricing grounded in break-even × loading × willingness Credit + contractor-invoice review applying Module 5 BS-detector · variance vs forecast explained
6 Compliance completeness < 5 of the 7 categories present All 7 categories represented · CoCs · WWCC log · image release · grand rights · records retention Pass + audit-bundle assembly demonstrated (could a WorkSafe inspector start reading?) Credit + contractor compliance-line challenge email drafted using Module 4 template
7 Stakeholder communications No parent communications calendar · OR comms structured around child-safety risk (e.g. no consent flow) 8-week parent-comms calendar · principal briefing 1 page · post-mortem template Pass + comms address late-night travel + WWCC + image release explicitly Credit + crisis-comms / postponement comms drafted as a "what-if"
8 Child-safety controls No WWCC log · OR image release form missing per-channel opt-out · OR flying-harness contemplated without parent consent process WWCC log started · image release form has per-channel opt-out · all minors named in flying / pyro have parent consent flow Pass + Reportable Conduct Scheme records-retention noted · medical declarations process documented Credit + child-safety review embedded in post-mortem template + parent-volunteer role list customised to this production
9 Team + delegation framework No org chart · OR no SM delegation contract · OR matrix has no clear "A" column Org chart + accountability matrix (≥10 decision-types) + SM delegation contract Pass + explicit bypass-detection lines for contractor / director-to-student / parent Credit + escalation script for each bypass type · paragraph on what happens if SM resigns 7 days from opening
10 Contractor-quote literacy No contractor BS-detector review demonstrated One contractor quote reviewed with M / R / O / T tagging Pass + at least 2 contractor quotes reviewed · savings calculated Credit + a written-back-to-contractor email drafted using the Module 1 template · expected response handled
11 Reflection specificity Reflection is generic ("I learned a lot" / "everyone worked hard") · no specifics 500-700 word reflection · names specific frameworks · addresses the SM-resigned hypothetical Pass + identifies 3 specific things the candidate would resist about implementing the framework at their school Credit + one-paragraph plan to overcome school-specific resistance · names principal-level conversation needed
12 Professionalism + presentation Portfolio is incomplete OR uses placeholder text "[insert name]" OR submitted late without arrangement Six deliverables present · proofed · presentable to a principal Pass + consistent formatting + clear file naming + table-of-contents + page numbers Credit + portfolio presented as a single navigable PDF · could be re-used as a real SOP pack with minimal editing

Overall grading

GradeThresholdWhat it means
PASS≥8 criteria at Pass · 0 Critical-fails · all 6 deliverables presentTier 1A complete. Certificate issued. 9 CPD hours awarded. Eligible for Tier 1B.
CREDIT≥8 at Pass · ≥4 at Credit · 0 Critical-failsAbove + assessor commentary highlighting the strongest deliverable. Eligible for Tier 1A featured-portfolio (anonymised) library.
DISTINCTION≥8 at Credit · ≥4 at Distinction · 0 Critical-failsAbove + LinkedIn-share-ready Distinction badge + invitation to mentor incoming Tier 1A candidates (paid).
RESUBMIT≥1 Critical-fail OR <8 at PassAssessor notes returned with specific re-work scope. Resubmission within 30 days for fresh assessment. Most resubmits pass on the second attempt.